

LIBRARY UNDERGROUND PARKING CHARGING STATION
DATE: January 12, 2024
LOCATION: Yueqing, Zhejiang
NAME:Library Charging Project
QUANTITY: 10Pcs 120kW DC Charger+5 Pcs 7kW AC Chargers
01. Description
In recent years, the new energy automobile industry has entered a period of rapid development. In order to better serve the development of new energy vehicles and promote energy conservation and emission reduction, our city has accelerated the improvement of charging facilities, optimized service models and a series of supporting means to enable electric vehicles to “return home, leave the city, and travel to the countryside.”
The city library charging station can accommodate 22 electric vehicles for charging at the same time. The maximum output power is 120KW and the maximum output current is 300A. You can use the charging program on the Internet of Vehicles and just scan the code to plug and charge. At the same time, there is also a driver’s lounge, which provides free drinking water and leisure and entertainment services to car owners.






02. solutions & tips
A total of 10 120kw dual-gun charging piles are installed in the station. The operation is simple and convenient. On average, one vehicle is charged in about 40 minutes. It is efficient and fast. We provide charging services for new energy vehicles in our city 24 hours a day.
In addition to the municipal library charging station, Yueqing has already set up new energy vehicle charging stations on Chuangchuang Road, Kaifeng Road, Jianshe Road, etc., relying on the “people-vehicle-pile-network” big data to achieve fast, efficient and low-labor cost operation of charging stations. , through multi-level and three-dimensional services, we create a “co-construction, sharing, and win-win” service model.
There are a lot of charging piles here, and the charging is very fast. We can start operating on the road after 40 minutes of full charging. The overall feeling is pretty good.• Driver Zhou Jin
The construction of these charging stations is consistent with the national development strategy, industrial orientation, residents’ needs, and environmental protection. While providing charging services, we will also actively promote the implementation of our city’s new energy vehicle supporting industry and lead it forward. At the forefront of the times.
In the next step, State Grid Yueqing Power Supply Company will continue to serve the dual carbon goals, continue to build an electricity-centered green energy consumption system, and strictly follow the requirements of the “Yueqing City’s “14th Five-Year Plan” Electric Vehicle Charging Service Network Plan”, combined with “Create “Three-minute charging circle in central urban areas” work to accelerate the layout of charging networks.